Skip to content

Double Plug Cementing Head

Original price $0.00 - Original price $0.00
Original price
$0.00
$0.00 - $0.00
Current price $0.00

Oil Baron Supply’s Cementing Head is designed to hold a cementing plug before it is
pumped down the casing during the cementing operation. In most operations, a bottom
plug is launched before the spacer or cement slurry.

The top plug is released from the cement head after the spacer fluid. A manifold
incorporated into the cement head assembly allows connection of a fluid circulation
line. Oil Baron Supply offer both types of Cementing Head.

View the Full Range Here